During F5 units purchase contract with Marubeni Company, the manufacturer (Hitachi) was proposed that the following items were designed and manufactured by the company, which according to the capabilities of Engineering Design and Construction unit, the proposal was accepted by the manufacturer.

  • Exhaust system
  • Input air system
  • GAC Battery and battery charger panels
  • Battery and battery charger
  • Fire fighting system
  • Control  chamber  and HVAC system
  • DCS system
  • Civil matters
  • BOP electrical
  • BOP mechanical

Back to Previous Page